SQUARE & LEVELESTIMATING · NATIONWIDE

Square & Level / Sitework estimating

Divisions 31–33 · Sitework

Sitework, paving & utility estimating

Clearing, earthwork, paving, curbs and site utilities measured from your civil drawings, with pipe by size and structures counted each. Fixed quote in 2 hours, bid-ready takeoff in 24–48 hours, for site contractors in any state.

2 hrs to a fixed quote24–48 hrs delivery, rush available50% off your first estimate (up to $150)

What's in the takeoff

From clearing to final paving.

  • 31 10 00Clearing, grubbing and demolition in SF and AC
  • 31 23 00Excavation, fill and import or export in CY
  • 31 25 00Erosion control, silt fence and inlet protection
  • 32 12 00Asphalt paving and base in SF and tons
  • 32 13 00Concrete paving, sidewalks and pads in SF
  • 32 16 00Curb and gutter in LF by type
  • 33 40 00Storm pipe by size in LF, with inlets and structures
  • 33 30 00Sanitary sewer pipe and manholes
  • 33 10 00Water mains, services and fire hydrants
  • 32 90 00Sod, landscaping and striping allowances

Every takeoff comes with marked-up plan sheets so you can check each count, an editable Excel file with live formulas, and written assumptions and exclusions. Reviewed by our in-house general contractor, estimator and engineers before delivery.

Pricing

Single sitework takeoff

$99

Order one takeoff

Bidding every week? Monthly plans from $299 for 4 takeoffs. Unused takeoffs roll over.

Join Bid Desk · $549/mo · 8 takeoffs See all plans

Full estimates with pricing: $249 residential or remodel, $499 custom home or commercial. Large projects are quoted.

Who it's for

For site, paving and utility contractors.

Site contractorsEarthwork and site development.
Paving contractorsAsphalt, concrete paving and curbs.
Utility contractorsStorm, sewer and water scopes.

FAQ

Sitework estimating: common questions

What drawings do you need for sitework?

The civil drawings: site, grading, paving, drainage and utility plans with profiles and details, plus the geotechnical report if available.

Do you calculate cut and fill?

Yes. When existing and proposed grades are shown, we estimate cut and fill volumes and list import or export.

Is pipe listed by size?

Yes. Pipe is measured in linear feet by size and material, and structures are counted each.

Can you split onsite and offsite work?

Yes. Onsite and offsite or right-of-way work can be listed separately.

How much does a sitework takeoff cost?

A single-trade takeoff is $99. Full priced estimates are $249 for residential or remodel and $499 for custom homes or commercial. Monthly plans start at $299 for 4 takeoffs, and unused takeoffs roll over.

Request a quote

Have a bid coming up? Send the plans.

Email
bids@squareandlevelfl.com
Call or text
Service area
Nationwide · all 50 states. 100% remote: send plans from anywhere.

Include the project address or city, the drawings, and your bid due date. You'll get a fixed quote within 2 hours during business hours.

See the format before you order. Each sample has marked-up plan sheets, a quantity takeoff by CSI section and a priced estimate:

Need another trade? Email us and we'll send a sample.