SAMPLE · NOT A CLIENT PROJECT
Estimating · Nationwide
Sample Office · Framing & Drywall
Estimate SL-SAMPLE-09
Division 09 · Framing, drywall + ceilings · Takeoff + priced estimate

Sample Office · Interior build-out

Commercial tenant improvement · ~6,000 sq ft office · 1 floor · 9'-0" ACT ceiling, 14'-0" to deck · sample prices
Estimate total$148,990$24.83/sq ft
Material$50,369incl. waste + tax
Labor$71,463871.5 hrs @ $82/hr
Partitions602 LF+ 160 LF furring

Summary

ItemAmount
Material (from takeoff, page 3)$45,229
Waste factor, 5% on framing, ceilings + accessories (board waste is already in the sheet counts)$1,845
Sales tax on material, 7% (sample rate)$3,295
Labor, 871.5 hrs at $82/hr loaded$71,463
Equipment, 19 ft scissor lift, 2 weeks$1,300
Direct cost$123,132
Overhead, 10%$12,313
Profit, 10%$13,545
Bid total, Division 09 framing, drywall + ceilings$148,990

Prices shown are sample prices. On every real job, the labor rate, sales tax, overhead and profit are set to your numbers. You get the Excel file with live formulas, so you can change any rate and the total updates.

What's in your package

Reviewed before delivery: every takeoff is checked by our in-house general contractor, estimator and engineers. One round of revisions included.
squareandlevelfl.com · bids@squareandlevelfl.comPage 1 of 4
SAMPLE · NOT A CLIENT PROJECT
Estimating · Nationwide
Sample Office · Framing & Drywall
Estimate SL-SAMPLE-09

Marked-up plan sheet A-101

Every wall is color-coded by partition type and every item is tagged, so you can check our lengths and areas against your drawings line by line.
OFFICEOFFICEOFFICEOFFICEOFFICECONFERENCEEXECHUDDLEHUDDLEWOMEN'SMEN'SITBREAKCOPYRECEPTIONOPEN OFFICE A A A B B B C C D D E E 1 2 3 4 5 6 7 8 9 10 11 CORRIDOR (base building) · demising wall by tenant A-101 · PARTITION PLAN + RCP · NTS
Color / markPartition type · constructionMeasured
━ red · A3-5/8" 20ga to deck, 5/8" Type X each side, sound batts (demising, IT)184 LF
━ blue · B3-5/8" 25ga to 6" above ceiling, 5/8" Type X each side, sound batts298 LF
━ green · C2-1/2" 25ga to 6" above ceiling, 5/8" Type X each side, no insulation64 LF
━ purple · D3-5/8" 20ga to deck, 5/8" MR wet side, sound batts (restrooms)56 LF
┅ orange · E7/8" hat channel furring at exterior wall, 5/8" Type X one side160 LF
▨ blue hatch / ▭ tanDrywall ceiling (restrooms) / drywall soffit (reception); grid = ACT384 / 160 SF
● yellow tagsTakeoff items, matching the plan references on page 3; yellow band = Level 5 walls11 tags

Drawing simplified for this sample. On real jobs we mark up your actual PDF sheets and deliver them with the estimate.

squareandlevelfl.com · bids@squareandlevelfl.comPage 2 of 4
SAMPLE · NOT A CLIENT PROJECT
Estimating · Nationwide
Sample Office · Framing & Drywall
Estimate SL-SAMPLE-09

Quantity takeoff + pricing

CSIDescription · plan referenceQtyUnitMaterialHrsLabor
METAL STUD FRAMING · 09 22 16
09 22 16Type A · 3-5/8" 20ga studs @ 16" o.c., to deck, 14'-0" · A-101 · red · tag 1184LF$2,28231.5$2,583
09 22 16Type B · 3-5/8" 25ga studs @ 16" o.c., 9'-6" (6" above clg) · A-101 · blue · tag 2298LF$1,52030$2,460
09 22 16Type C · 2-1/2" 25ga studs @ 16" o.c., 9'-6" · A-101 · green · tag 364LF$2626$492
09 22 16Type D · 3-5/8" 20ga studs @ 16" o.c., to deck, wet walls · A-101 · purple · tag 456LF$6949.5$779
09 22 16Type E · 7/8" hat channel furring @ 16" o.c., exterior · A-101 · orange · tag 5160LF$68811$902
09 22 16Bottom track, 3-5/8" 20ga, Types A + D · A-101 · tags 1, 4240LF$2760$0
09 22 16Deflection track, slotted 3-5/8" 20ga, top of to-deck walls · A-101 · tags 1, 4240LF$5885$410
09 22 16Track, 3-5/8" 25ga, top + bottom, Type B · A-101 · tag 2596LF$4290$0
09 22 16Track, 2-1/2" 25ga, top + bottom, Type C · A-101 · tag 3128LF$790$0
09 22 16Kickers to structure @ 4'-0" o.c., Types B + C · A-101 · tags 2, 390EA$40513.5$1,107
09 22 16Door openings, double 20ga jambs + header (HM frames by Div 08) · A-101 · tag 615EA$63015$1,230
09 22 16Backing, 20ga plate: grab bars, casework, wall-mounted TVs · A-101 · tag 7120LF$3907$574
ACOUSTIC INSULATION + SEALANT · 09 81 00
09 81 00Sound batts, 3-1/2" unfaced, full height, Types A, B, D · A-101 · tags 1, 2, 46,191SF$4,82937$3,034
07 92 00Acoustical sealant, head + base both sides, Types A, B · A-101 · tags 1, 21,928LF$61719.5$1,599
GYPSUM BOARD · 09 29 00
09 29 005/8" Type X, walls · 324 sheets 4x12 incl. 10% waste · A-101 · tags 1–514,110SF$7,258226$18,532
09 29 005/8" Type X moisture-resistant, wet side · 24 sheets 4x12 incl. 10% · A-101 · tag 41,008SF$75618$1,476
09 29 005/8" sag-resistant ceiling board · 13 sheets 4x12 incl. 12% · RCP-101 · tags 8, 9544SF$32214$1,148
09 22 26Drywall suspension grid, restroom ceilings · RCP-101 · tag 8384SF$1,0188.5$697
09 22 16Soffit framing, 3-5/8" 25ga, 2'-0" box at reception · RCP-101 · tag 964LF$60811.5$943
09 29 00Screws + fasteners allowance ($0.035/SF of board) · —15,662SF$5480$0
TRIM + FINISH · 09 29 00 (GA-214 finish levels)
09 29 00Corner bead, metal, outside corners · A-101210LF$1224$328
09 29 00L-bead at window returns and mullions · A-101 · tag 5140LF$913.5$287
09 29 00Control joints, zinc, 30'-0" max spacing · A-10148LF$772$164
09 29 00Level 4 finish, tape + 3 coats + sand (mud/tape allowance) · A-101 · RCP-10112,830SF$1,411218$17,876
09 29 00Level 5 finish, skim coat, reception + conference walls · A-101 · tag 10432SF$8212$984
09 29 00Level 1 fire-tape, above ceiling on to-deck walls · A-101 · tags 1, 42,400SF$969.5$779
ACOUSTICAL CEILINGS · 09 51 13
09 51 13Suspension grid, 15/16" exposed tee, 2x2, intermediate duty · RCP-101 · tag 115,210SF$7,55573$5,986
09 51 13ACT, 2x2 mineral fiber, square tegular, NRC 0.70 · RCP-101 · tag 115,210SF$11,20236.5$2,993
09 51 13Wall angle, perimeter molding · RCP-101 · tag 11820LF$39410$820
GENERAL
01 74 00Layout, stocking, material handling and daily cleanup · —1LS$040$3,280
Totals$45,229871.5$71,463

Labor at $82/hr loaded (sample rate). Partition LF measured through door openings. Board SF is net wall area; sheet counts include waste.

squareandlevelfl.com · bids@squareandlevelfl.comPage 3 of 4
SAMPLE · NOT A CLIENT PROJECT
Estimating · Nationwide
Sample Office · Framing & Drywall
Estimate SL-SAMPLE-09

Assumptions

Exclusions

How to order your estimate

StepWhat happens
1. Send your plansEmail PDF drawings and specs to bids@squareandlevelfl.com and include your bid due date.
2. Fixed quote in 2 hoursWe reply with the price and delivery time before any work starts.
3. Estimate deliveredMarked-up sheets, takeoff and Excel estimate, usually within 24–48 hours.
4. One revision includedTell us what changed and we update the numbers.
First estimate 50% off (up to $150). Built by a contractor with 15 years running jobs, plus luxury residential and commercial construction leadership.

This is a sample created to show our format. The project, quantities and prices are illustrative, not a client job or a quote.

squareandlevelfl.com · bids@squareandlevelfl.comPage 4 of 4